How to choose an interior design company in Dubai
Choosing an interior design company in Dubai is harder than it looks. This guide explains what to check before you sign. It covers design and build skills and award wins. It also covers approvals, briefs, budgets, and key questions every firm should answer.
Written by
Eng. Maher Mouhajer
Choosing an interior design company in Dubai is harder than it looks. This guide explains what to check before you sign. It covers design and build skills and award wins. It also covers approvals, briefs, budgets, and key questions every firm should answer.
Selecting an interior design company in Dubai is considerably more difficult than it first appears, because every portfolio looks beautiful and two quotations rarely cover the same scope of work. This guide explains what to verify before you sign an agreement with any company, including ours.
Decide whether you need a decorator or a design and build firm
Some firms specialize in selecting furniture and finishes, while others relocate walls, reroute building services and manufacture the joinery themselves.
A living room refnd a complete villa renovation require different teams, different budgets and very different levels of coordination, so settle this question before you approach anyone.
We operate as a single design and build company. The professionals who design your interior are the same people who estimate it, construct it and hand it over. If a measurement proves inaccurate or a finish arrives behind schedule, you contact one company and we take responsibility for resolving it.
We are Mouhajer International Design and Contracting (MIDC), a leading interior design and turnkey contracting firm with headquarters in Burj Vista, in the heart of Dubai.
We bring over 25 years of award winning experience in architecture and interior design to residential, hospitality and commercial properties.
Our work covers six disciplines:
- Interior architecture: space planning and the design concept that determines how each room looks and functions.
- MEP engineering: air conditioning, electrical and plumbing design that complements the interior instead of competing with it.
- Manufacturing and joinery: high quality wardrobes, wall paneling, doors and furniture produced specifically for your project.
- Fit out: the installation and finishing work carried out on site.
- Civil construction: structural work and layout alterations. We are a licensed building contractor in Dubai and Abu Dhabi.
- Handover and maintenance: continuing support after you move in.
You will not necessarily need all six. Describe the result you want and we will recommend which disciplines belong in your proposal.
Look for proof you can check
Any firm can describe itself as one of the best, so ask for named projects, named awards and a completed site that you can visit in person.
In 2024 the Address Boulevard VIP Suite won Best Hotel Suite Interior Dubai and Best Hotel Suite Interior Arabia.
During the same year, Address Boulevard Penthouse 70 and 71, a duplex that we designed and built, won Best Residential Interior Apartment Dubai. In 2023 our hospitality work received five star awards for Best Hotel Interior Abu Dhabi and Best Luxury Hotel Interior. The complete list is available on our awards page.
Our projects cover a wide variety of spaces, from internationally recognized hotels such as Grand Hyatt Dubai, Address Dubai Marina and Dubai Creek Resort to a private villa in MBR City and Arto Coffee. We also hold ISO 9001, ISO 14001 and ISO 45001 certification for quality, environmental management and site safety.
Awards demonstrate that a firm can deliver at a high standard, but they cannot tell you whether the team is suitable for your particular project.
When you review any portfolio, look beyond the photographs. Examine how the storage functions, how the lighting is controlled and how the joinery meets the wall, because that attention to detail reveals more than any photograph. Afterwards, ask to see a completed project that closely resembles your own property type.
Start with how you live, then choose finishes
The most useful briefs we receive describe an ordinary day in the house, and decisions about marble and wall colors follow later.
Your majlis may need to accommodate twenty guests on Friday and still feel like a comfortable family room on Monday. A bedroom may require concealed storage, a quiet corner for reading and lighting that encourages restful sleep. A media wall requires a plan for equipment access, cable routes and ventilation before anyone selects the surrounding stone. If your penthouse has panoramic views, position the seating and the lighting so that the view of Dubai remains the principal feature.
Explain to your designer where everyday belongings will be stored, which pieces of furniture you intend to keep and how people move through the space. An experienced firm will raise these questions before it presents a single mood board.
Match the firm to your type of space
Homes, hotels and workplaces demand different expertise, so confirm that a firm has previously delivered your kind of project.
- Homes. A family friendly home gives priority to comfort, privacy and storage, and the daily routines of the family determine the layout. See our residential work.
- Hotels. A suite must satisfy a guest for three nights and withstand housekeeping every single day. Durable materials, uncomplicated lighting controls and convenient service access matter as much as the appearance. The same consideration applies to the lobby, the spa and the dining options. See our hospitality work.
- Offices and retail. The space has to support employees and impress visitors simultaneously. Consider how people arrive, whether by car or by public transportation, where teams gather and how the layout can adapt as the business expands.
Ask who handles approvals in Dubai
Most renovation and fit out work in Dubai requires written approval before any work begins on site, and many owners discover this only after they have committed to a move in date.
The usual sequence is:
- Developer or community NOC. Emaar, Nakheel and other master developers issue their own no objection certificate. In a tower, the building management or the owners association performs the same function.
- Building permit. Dubai Municipality covers most of the mainland, while certain areas fall under other authorities such as Trakhees or the Dubai Development Authority.
- Dubai Civil Defence. Required when the work affects fire and life safety.
- DEWA. Required when the electrical load or the water connections change.
The exact requirements depend on your property and the scope of work. Painting and loose furniture rarely require a permit, whereas relocating a wall, a kitchen or a bathroom, or adding a swimming pool, almost always does. Approvals can take several weeks, which is why they belong in the program from the very first day.
Ask every firm on your shortlist who prepares the drawings, who submits them and whether the authority fees are included in the quotation. We manage this entire process for our clients as part of the project.
Bring a clear brief to the first meeting
You do not need to have every finish decided, but you do need to give the team something concrete to evaluate. Prepare the following five items:
- Property details. Location, property type, floor plans and photographs of the current condition. Include the age of the building and any known problems such as damp or outdated wiring.
- Scope. List the rooms you want to change, and indicate whether you require decoration, renovation or a complete design and build proposal.
- Style references. Five or six interiors you admire, with a note explaining what appeals to you in each one. A folder of forty unrelated images sends the team in several directions at once.
- Practical needs. Storage, furniture you intend to keep, working from home, and anyone in the household with particular mobility or comfort requirements.
- Budget and dates. Tell the team how much you plan to invest and share any fixed deadline, such as a move in, a hotel opening or the start of a lease. An honest budget produces options that are realistic for you.
Six questions to ask every firm
The answers reveal how a team thinks and how it will treat you once you have signed the contract. Ask us the same six.
- Who will lead my project, and who will I communicate with each week?
- Which work do you carry out yourselves, and which do you assign to outside specialists?
- Who is responsible for the NOC and permit applications?
- What happens if I change my mind after I have approved the drawings?
- How will you inform me about delays, additional costs or substituted materials?
- What support do you provide after handover?
Record the answers in writing and compare them with what each proposal states on paper. If an answer seems vague, ask again, because a reliable team is always willing to explain.
Plan the budget and the timeline together
Every decision on a luxury project influences both cost and time. Custom joinery, imported stone and specialist lighting take considerably longer to produce than standard items, so ask which items have the longest lead times and the date by which you must approve them.
Keep a contingency reserve for surprises, because older villas and apartments can conceal problems behind walls and above ceilings. A sound proposal explains how the contractor will price and approve additional work, and you should agree that procedure before the project begins.
If one particular date matters to you, mention it at the first meeting. The team can then plan backwards from it and alert you early if the schedule appears tight.
Four mistakes that cost owners money
Most troubled projects fail for surprisingly simple reasons.
- Choosing finishes before you agree the layout. You pay later to alter work that the contractor has already completed.
- Comparing quotations on price alone. Align the scope and the exclusions first, and only then compare the totals.
- Leaving storage until the end. The finished room becomes cluttered within a month.
- Approving drawings in a hurry. Problems often appear after the contractor completes the work, when correcting them costs the most.
Slow down at every approval stage. Read what you sign carefully and request a plain explanation of anything that remains unclear.
Take your time with the decision. Choosing the best interior design company in Dubai will influence how you live or work for many years, and it will affect the long term value of your real estate.
Talk to us about your project
Send us your plans and a short brief. We will explain what the project involves and share examples of completed spaces that most closely resemble yours.
Call or WhatsApp +971 52 304 1482
Email info@mouhajerdesign.com
Visit us at Burj Vista, Sheikh Mohammed bin Rashid Boulevard, Downtown Dubai
Stay Inspired
Get the latest insights on design, architecture, and luxury living delivered to your inbox.
No spam, ever. Unsubscribe at any time. Read our Privacy Policy.
About the Author