MIDC
Crafting Excellence
0%
Skip to main content
Address Dubai Marina
AWARD-WINNING PROJECT
Luxury Hospitality

Address Dubai Marina

Dubai Marina

Overview

Location

Dubai Marina

Client

Abu Dhabi National Hotels (ADNH)

Status

Completed

Type

Luxury Hospitality

Dates

Apr 2021 - Aug 2021

The Challenge

A Multi-Front Renovation Address Dubai Marina is a centerpiece of the vibrant Marina district. The objective was to modernize both the public face of the hotel and the private guest experience simultaneously. The scope was extensive: a complete refresh of the Main Lobby, a redesign of "The Restaurant," and a soft renovation of 220 Guest Rooms. The critical constraint was the timeline and operational continuity. With a budget of AED 27 Million, Mouhajer International Design had to deliver this multi-zone renovation in under 6 months. Crucially, the hotel remained fully operational, meaning the lobby and dining areas had to be renovated in phases to ensure guests were never inconvenienced, and room renovations had to be completely silent to neighbors.

Address Dubai Marina - Interior 2
Click to expand
1 / 45
Our Approach

Urban Luxury Refined

As the Design and Build contractor, we streamlined the process by overlapping the design approvals with the procurement and site mobilization phases.. Public Areas (Lobby & The Restaurant): We updated the lobby to reflect the chic, urban energy of the Marina, utilizing contemporary furniture and sophisticated lighting to create a seamless flow. For "The Restaurant," the design focused on creating distinct dining atmospheres—energizing for breakfast, yet intimate for dinner—using bespoke joinery and warm, ambient textures.. Guest Rooms (220 Keys): The soft renovation of the rooms focused on maximum visual impact with minimal structural intrusion. We replaced carpets, curtains, and upholstery, and introduced new art and accessories to align the rooms with the modern aesthetic of the Address brand.. Live Environment Management: To handle 220 rooms alongside the lobby, we treated the hotel as a "vertical city." Work was compartmentalized floor-by-floor, with strict noise curfews and invisible logistics paths for material transport.

01Design & Build
02Public Area Upgrade
03Room Renovation
Design approach

“Every space tells a story. Our role is to make it unforgettable.”

— Design Philosophy

Before & After

Drag the slider to reveal the transformation

After
After
Before
Before
Scope of Work Background
Deliverables

Scope of Work

01

Design & Build

Comprehensive responsibility for interior design and fit-out execution.

02

Public Area Upgrade

Renovation of the Main Lobby and "The Restaurant" (All-Day Dining).

03

Room Renovation

Soft refurbishment of 220 Guest Rooms and Suites.

04

FF&E

Sourcing and installation of new furniture, carpets, and soft furnishings throughout.

Results

The Outcome

Completed in August 2021, the project revitalized Address Dubai Marina's key assets in record time. By successfully managing the complex logistics of working in a live hotel, Mouhajer Design delivered a fresh, contemporary product that immediately enhanced the guest experience and asset value. "Revitalizing the Lobby, Dining, and 220 Rooms in under 6 months without hitting pause on operations."

Outcome & Results

Before & After

After
After
Before
Before

Revitalizing the Lobby, Dining, and 220 Rooms in under 6 months without hitting pause on operations.

MIDC Team

Dubai Creek Resort
Previous

Dubai Creek Resort

Luxury Hospitality
Ready to Start?

Let's Create
Something Exceptional

Transform your vision into reality with our expert team

Book Consultation
Address Dubai Marina
Next

Address Dubai Marina

Luxury Hospitality